Chrudim – Waidhaus
Our company was involved in a project to transport steel tubes for a German wind farm. In March and April, we were involved in several transports of steel tubes to serve as the basis for wind farms in Germany. These tubes measured up to 30 metres in length and weighed tens of tonnes. Transporting such loads required special rigs as well as accompanying vehicles, which we provided. Our work also consisted of obtaining all the permits for special use of the road for foreign transporters. Watch the video to see how we handled this challenge.